The problem of storing snow removed from city streets is a complex engineering and environmental logistics task. It arises where the volume of snow exceeds its immediate melting or utilization capacity. The evolution of approaches to snow "cemeteries" reflects the development of urbanism, technology, and environmental awareness.
Historically, snow was shoveled into piles (heaps) on the sides of roads, in courtyards, and on vacant lots. However, with the growth of cities and road traffic, this snow no longer remained clean. It turns into a technogenic mixture containing:
Deicing agents (sodium, calcium, magnesium chlorides)
Heavy metals (lead, cadmium, zinc) from tire and brake pad wear
Oil products, technical fluids
Domestic waste, sand
When melting in the spring, all these pollutants concentrate in the soil and groundwater, and through stormwater sewers — into water bodies. This leads to soil salinization, the death of vegetation, and contamination of drinking water sources. Therefore, uncontrolled snow storage on lawns or within city limits is today legally prohibited in many countries.
Modern snow dumps are not just land plots, but engineering structures designed in accordance with environmental standards. Their location and design are regulated by SanPiNs and construction standards (in Russia — SP 32.13330.2018, analogs exist in other countries). Key principles:
Insulation from the ground: The site must have a waterproof covering (asphalt concrete, polymer membrane) and embankments for collecting meltwater.
System for collecting and cleaning meltwater: Channels or wells are arranged around or in the center of the site, from which water is drained through pipes to local treatment facilities (LOF). Treatment usually includes sedimentation, filtration, neutralization of reagents.
Distance from residential construction and water bodies (usually not less than 500-1000 meters).
Interesting fact: For example, in Moscow, large snow melting points operate, and permanent snow dumps are used rarely. However, where they exist (for example, in Zelenograd), they are concrete platforms with a system for draining runoff to treatment facilities.
To minimize storage areas and accelerate the process, technologies for active utilization are being developed:
Stationary snow melting points (SPP): Represent shafts or reservoirs where snow is loaded by dump trucks. Inside, it melts due to:
Heat from city utilities (hot water from heating networks, which is the most economical).
Electric or gas heaters.
Hot air from running engines.
Meltwater after multi-stage purification (sand separators, oil separators, sorption filters) is discharged into stormwater sewers. Modern SPP can process up to 500-1000 cubic meters of snow per hour.
Mobile snow melting units: Small units on truck chassis that can be quickly deployed in problem areas. Their productivity is lower (30-150 cubic meters per hour), but they are flexible in use and do not require the construction of capital facilities.
Snow chutes (snow collection collectors): An underground system used in some cities in Japan (Sapporo) and Canada (Montreal). Snow is dropped into special receiving pits on the streets, from where it is washed away by a strong stream of hot water through large-diameter pipes directly into water bodies or treatment facilities. This eliminates the need for trucks for transportation.
Helsinki, Finland: Use a system of underground reservoirs-snow melting points, where snow is shoveled from the streets. They are located under parking lots or lawns. Snow melts due to the natural heat of the ground, and water filters and goes into the soil, which is possible due to relatively clean snow (mainly gravel is used, not chemical reagents).
Toronto, Canada: Use a network of snow dumps on the outskirts of the city with mandatory stormwater treatment systems. Interestingly, there is a "snow cannon" technology used there — a special device that breaks up snow heaps to accelerate melting.
St. Petersburg, Russia: Has one of the most powerful snow melting systems in the world. The design capacity of SPP is more than 50 thousand cubic meters of snow per day. For heating water, heat from the heat and power plants of JSC "TEK SPb" is actively used.
Key challenges:
High cost: The construction and operation of SPP or equipped dumps require huge budgetary expenditures.
Energy consumption: Melting snow is an energy-intensive process.
Search for sites: Finding a place for a snow melting plant or dump that meets all standards is extremely difficult in densely populated megacities.
The future is likely to be for combined solutions:
Use of renewable energy sources (solar collectors, heat pumps) for snow melting.
Preliminary cleaning of snow at the collection site (for example, separation of waste and sand).
Development of environmentally friendly deicing materials that will not contaminate the snow cover, which will simplify its utilization.
Modern snow storage is not just the removal "as far as possible". It is an essential part of the city's environmental infrastructure, requiring a scientific approach, engineering solutions, and significant investments. The transition from spontaneous heaps to equipped snow melting complexes reflects the general trend towards smart and responsible management of urban affairs, where even temporary seasonal problems are solved with a view to long-term consequences for the environment and the health of citizens.
New publications: |
Popular with readers: |
News from other countries: |
![]() |
Editorial Contacts |
About · News · For Advertisers |
Digital Library of Austria ® All rights reserved.
2025-2026, ELIBRARY.AT is a part of Libmonster, international library network (open map) Preserving Austria's heritage |
US-Great Britain
Sweden
Serbia
Russia
Belarus
Ukraine
Kazakhstan
Moldova
Tajikistan
Estonia
Russia-2
Belarus-2